Rs 44.91 Cr.
Frequent rock fall creates major hinderance operation of train in Ranchi- Barkakhana section
The work involved rockfall protection in the Ghat section to mitigate rockfall hazards along the railway tracks. The protection measures included the Design, Supply and installation of High tensile wire rope net, rock bolts, Shotcrete, Debris Flow barrier, Rockfall Barrier with Hellomac.


Rs 41.06 Cr.
Frequent rock fall creates major hinderance operation of the Indo-China border road infrastructure.
For slope protection and landslide mitigation, various engineering solutions were implemented, including Macmat HS with Hydroseeding, Steel Grid HR, Consolidated Erdox for road widening , soil nailing, Prestressed Cable anchor and debris flow barriers.
Rs 13.22 Cr.
Frequent rock fall creates major hinderance operation of train in Karjat–Lonavala section
The work involved rockfall protection in the Ghat section to mitigate rockfall hazards along the railway tracks. The protection measures included the installation of HEA panels, rock bolts, Canadian fencing, and a 3000 KJ dynamic rockfall barrier.


Rs 18.54 Cr.
Frequent rock fall creates major hinderance operation of the Indo-China border road infrastructure.
For slope protection and landslide mitigation, various engineering solutions were implemented, including Steel Grid HR, HEA Panels, soil nailing, and debris flow barriers.